Q1: How deep should the threshold or bases be buried? A1: The threshold should be buried 3 cm deep, support base should be buried 5~6 cm deep, middle post base should be buried 6~7 cm deep, and customized post base should be buried 10 cm deep. |
Q2: Is it necessary to install threshold? A2: There are gaps and cracks on the ground/floor, e.g. tile gaps, marble gaps and rough, uneven ground/floor which may cause leakage easily; therefore threshold under the panel is necessary for the prevention of possible leakage. Threshold is only unnecessary if the leakage is tolerable. |
Q3: Is there anything protrudes from the ground/floor after the flood panel is installed? A3: All the threshold and bases are designed to be embedded into the ground/floor, therefore threshold and bases will be leveled to the ground/floor to avoid tripping hazard. |
Q4: How do threshold and those bases be fixed? A4: Threshold and bases will be fixed by concrete cement. |
Q5: How does support be fixed? A5: There are bases for support fixing; supports are designed to be embedded into the base, with braces of the support embedded into the base of support brace and fixed with bolts. |
Q6: How does back support be installed if there’s no enough space behind the flood panel? A6: Designs of ceiling support and reverse wire support are available options. |
Q7: How much space does installing side posts need? A7: It needs at least 10 cm for side posts fixing, but space for handle operating and support applying are also need to be considered. |
Q8: How do side posts be fixed? A8: Side posts are fixed by bolt fixing and silicone applying afterward. |
Q9: Will silicone oxidize? A9: Silicone will oxidize, the oxidize speed is based on the circumstance of the installation environment; It can last in normal circumstance well, like those applied on the glass walls of buildings. 2 layers of silicone will be applied when installing side posts, silicone on outer layer will keep the inner layer well, thus no concern about side posts fixing will be caused. |
Q10: How does the flood panel be installed if the ground/floor is slope? A10: Professional planning would be necessary after site survey. |