Q1: How do I know if the flood panel is well-deployed?

A1: It is important that the deployment is conducted by following steps in the operation manual; screw rod of tightening lock should have a 1 cm leftover after it is tightened, and all the rubber should be tightened and looked bulged.

Q2: How do I make sure there will be no leakage after my flood panel is deployed?

A2: Check if the tightening locks and rubber are tightened as they are indicated in the operation manual.

Q3: Can I deploy my 4 panels high flood panel with just 2 panels?

A3: Yes, smaller panels could be provided as the filling for the downward pressing of tightening locks.

Q4: Can I keep my flood panel deployed at all times?

A4: It is not recommended to tighten the rubber for more than 1 month, or the rubber can get elastic fatiguing once it has been tightened for a long time. It takes more than one week for elastic recovery.