Q1: How deep should the threshold or bases be buried?

A1: The threshold should be buried 3 cm deep, support base should be buried 5~6 cm deep, middle post base should be buried 6~7 cm deep, and customized post base should be buried 10 cm deep.

Q2: Is it necessary to install threshold?

A2: There are gaps and cracks on the ground/floor, e.g. tile gaps, marble gaps and rough, uneven ground/floor which may cause leakage easily; therefore threshold under the panel is necessary for the prevention of possible leakage. Threshold is only unnecessary if the leakage is tolerable.

Q3: Is there anything protrudes from the ground/floor after the flood panel is installed?

A3: All the threshold and bases are designed to be embedded into the ground/floor, therefore threshold and bases will be leveled to the ground/floor to avoid tripping hazard.

Q4: How do threshold and those bases be fixed?

A4: Threshold and bases will be fixed by concrete cement.

Q5: How does support be fixed?

A5: There are bases for support fixing; supports are designed to be embedded into the base, with braces of the support embedded into the base of support brace and fixed with bolts.

Q6: How does back support be installed if there’s no enough space behind the flood panel?

A6: Designs of ceiling support and reverse wire support are available options.

Q7: How much space does installing side posts need?

A7: It needs at least 10 cm for side posts fixing, but space for handle operating and support applying are also need to be considered.

Q8: How do side posts be fixed?

A8: Side posts are fixed by bolt fixing and silicone applying afterward.

Q9: Will silicone oxidize?

A9: Silicone will oxidize, the oxidize speed is based on the circumstance of the installation environment; It can last in normal circumstance well, like those applied on the glass walls of buildings. 2 layers of silicone will be applied when installing side posts, silicone on outer layer will keep the inner layer well, thus no concern about side posts fixing will be caused.

Q10: How does the flood panel be installed if the ground/floor is slope?

A10: Professional planning would be necessary after site survey.